Concrete block and brick calculator

Enter the wall and what it is built of. This counts the blocks or bricks to order with waste, the bags of mortar at your bag's own yield, and the vertical rebar at the spacing on your drawing.

ft
ft

Above the footing

sq ft

0 if there are none

%

Broken and cut units, often 5–10%

blocks

Printed on the bag — this default is a typical 80 lb premixed bag, not a standard

in

The spacing on your drawing

Bought as

Blocks to order

114blocks

Bags of mortar

9

Wall area

96 sq ft

Courses

6

Where the number comes from

Gross wall area
96 sq ft
Wall to layAfter 0 sq ft of openings
96 sq ft
Blocks per sq ft144 sq in over a 16" x 8" nominal face, joint included
1.125
Blocks in the wall
108
Ordered with wastePlus 5%, rounded up
114
Mortar108 laid at 13 a bag — waste not included
9 bags

Vertical rebar

BarsOne at each end, then 48" apart — no gap over 48"
7 at 4 ft
Total length
28 ft
20 ft sticks5 bars cut from each
2

Counts the bars in the wall only. The lap onto the dowels coming up out of the footing, the extra bar each side of an opening, the bar size and which cores are grouted come from the drawing, not from this page.

Retaining and load-bearing walls

This counts material; it does not design a wall. A wall holding back soil, carrying a floor or a roof, or standing more than a few feet high needs its footing, reinforcement and grout specified by an engineer or by the building code your department enforces — and most departments want a permit before the first course goes down. Ring them before you order.