How many pavers for a 10x10 patio?

A 10x10 patio takes 473 standard 4 × 8 brick pavers in running bond, cuts included. Counts for every paver size, and the stone and sand that go underneath.

A 10' × 10' patio takes 473 pavers of 4 × 8 brick, laid in running bond with 5% for cuts.

450 cover the floor exactly, at 4.5 a square foot. Under them go 2.5 tons of crushed stone at 6" deep and 17 bags of bedding sand, held in by 40 ft of edge restraint.

How that is worked out

  1. A 4 × 8 paver is sized so it lays at 4" × 8" with its joint — 32 sq in each, so 144 ÷ 32 = 4.5 to the square foot.
  2. 100 sq ft × 4.5 = 450 pavers, and 5% more for the cuts along the edges is 473.
  3. The pattern sets the waste: running bond cuts only at the border, while a 90° herringbone cuts in two directions at every edge, so the same patio in herringbone is 495.

Pavers by patio size and paver, running bond with 5% waste

Pavers by patio size and paver, running bond with 5% waste
Patio4 × 8 brick6 × 912 × 1216 × 16
8' × 8'3031806838
10' × 10'47328010560
10' × 12'56733612671
12' × 12'68140415286
12' × 16'908538202114
16' × 20'1512896336189

Worth knowing

  • Sizes are nominal: most pavers are made a joint's width under the size on the label so they lay at it. If your pallet gives the actual size, add the joint in the calculator — counting a nominal size with a joint on top undercounts.
  • The base does the work. ICPI's guidance for a pedestrian patio on well-drained soil is 4–6" of compacted crushed stone under 1" of screeded concrete sand. Clay, wet ground or anything a car will park on wants more.
  • Waste allowances by pattern are a rule of thumb, not a published figure — running bond 5%, basket weave 5%, herringbone 90° 10%, 45° / diagonal 15%. Keep a few spares from the same batch; a replacement from a different run rarely matches in colour.